Features
A prioritised list of what to fix, and in what order.
The fix plan turns every weak or flagged answer into an action with an impact and effort rating, linked to the question it addresses. Red flags come first, then the actions that move the score most for the least work.
FIX PLAN · UK
Halden Robotics Ltd
- FX3Attach subcontractor agreementsImpactHighEffortLow
- FX7Rebuild time allocationImpactHighEffortMedium
- FX1Separate routine workImpactMediumEffortMedium
- FX12Record approval of final figuresImpactLowEffortLow
Ratings
Impact and effort, rated separately.
Each action in the fix plan carries two ratings. Impact is how much completing the action would change the position of the claim: an action that would clear a red flag on a large cost category is high impact; one that tidies an answer that is already strong is low impact. Effort is how much work the action is likely to involve for your team: attaching a document you already hold is low effort; reconstructing a year of time records from calendars and tickets is medium or high.
The two are kept apart on purpose. A high-impact, low-effort action is the obvious place to start. A high-impact, high-effort action still has to be done, but you may want to plan it rather than start it this afternoon. A low-impact, low-effort action can wait, or be dropped.
How the plan is ordered
- Actions that address a Red flag come first, whatever their effort.
- Within that group and then the rest, actions are ordered by impact, highest first.
- Where impact is equal, lower effort comes first.
The order is a recommendation. You can reorder the list, but the default puts the answers most likely to be challenged at the top.
Red flags first, then impact, then effort
The ordering is the same on every plan so a team that has used it once knows where to look.
Assign actions to people
Each action can be assigned to a colleague or an adviser with a due date, so the plan doubles as a task list for the claim file.
Re-score when actions are done
Upload the new evidence, re-run scoring, and the plan updates. Completed actions drop out and the ratings are reassessed.
Worked example
Four actions from the Halden Robotics Ltd plan
The sample is a fictional UK claim: 12 questions, 7 strong, 3 needing work and 2 red flags, scoring 68/100. These four actions show how the ordering works in practice.
- 1
FX3
Attach subcontractor agreements
ImpactHighEffortLowObtain the signed agreements or statements of work for each of the three subcontractors and confirm that the work was carried out on the company's behalf.
Relates to UK04 Subcontracted R&D costsRed flag - 2
FX7
Rebuild time allocation
ImpactHighEffortMediumReconstruct the R&D time split from calendars, ticketing history and sprint records, and have each lead confirm their team's percentages.
Relates to UK03 Staff time allocation recordsNeeds work - 3
FX1
Separate routine work
ImpactMediumEffortMediumList the tasks treated as routine and show how their hours were removed from the claim.
Relates to UK07 Routine work excludedNeeds work - 4
FX12
Record approval of final figures
ImpactLowEffortLowAlready supported. Keep the board minute extract with the claim file.
Relates to UK12 Approval of final figuresStrong
FX3 is first because UK04 is a red flag: the subcontractor agreements are missing, the cost category is material, and the fix is probably a matter of finding documents that already exist. FX7 follows: UK03 only needs work, but the impact is high because the time split underpins the staff cost, and the effort is medium because the records have to be rebuilt. FX1 is medium on both counts. FX12 is last; UK12 is already strong and the action is simply to keep the board minute with the file.
The full sample plan has more actions than the four shown here, including one for UK11 (grant treatment), the other red flag. See the sample report for the complete list.
Working the plan
Assign, complete, re-score.
A fix plan is only useful if someone does the work. Each action can be assigned to a named person, whether a colleague in finance or engineering or your external adviser, with a due date and a note. The person assigned sees the question, the matched evidence, the reason for the rating and the draft response, so they have what they need without reading the whole report.
When an action is complete, upload the new evidence and re-run scoring. The answer is reassessed against the updated file, the rating changes if the evidence now supports the answer, and the action drops out of the plan. Work through the fix plan to raise the score before you file or respond.
Re-scoring is also the honest test of whether a fix worked. If the agreements for UK04 are uploaded and the rating stays at red flag, the note will say why: perhaps the agreements do not describe the work, or do not show that it was performed on the company's behalf. That is better to learn now than during an enquiry.
- Every action links to one question and its matched evidence
- Assign to colleagues or advisers with a due date
- An editable draft response is attached to each action
- Re-score after uploading; completed actions drop out
- Export the plan with the report as a PDF
Draft responses are described on their own page: draft responses. For how the ratings themselves are produced, see evidence scoring.
Scope
A simulation, not a review.
Rehearse the audit before it happens.
Choose your country, upload what you have and see where the claim stands in an afternoon.