Features
The answers a reviewer would challenge first.
A red flag is an answer that is contradicted by your own evidence, or has no evidence at all where a reviewer would expect to see some. They are listed separately so nobody has to hunt for them.
RED FLAGS · UK
Halden Robotics Ltd
- UK04Subcontracted R&D costsRed flag
Invoices describe 'engineering services' only. No contracts or statements of work show that the work was R&D performed on the company's behalf.
- UK11Grant and subsidy treatmentRed flag
A grant covering part of the project is on file but the claim does not identify which costs were subsidised. This affects the scheme the costs fall under.
Definition
What makes an answer a red flag
Evidence scoring gives every answer one of three statuses: Strong, Needs work or Red flag. The first two describe degrees of support. A red flag is different in kind. It is raised in one of two situations:
- Contradicted by evidence. A document you uploaded says something that does not fit your answer or the claim as drafted. The document may be perfectly good; the problem is the gap between it and what has been claimed.
- No evidence where it is expected. The question is one for which a reviewer would normally ask to see a specific kind of document, and nothing of that kind is in the file.
An answer that needs work has some support and could be improved. A red flag has a hole in it that a reviewer would be likely to notice, and which the file as it stands cannot fill.
Contradicted
A document in your upload is inconsistent with the answer or the claim workings. The note names the document and the inconsistency.
Unsupported
Nothing in the file is of the type a reviewer would expect for this question. The note says what kind of document is missing.
Still based on your upload
A red flag means the file does not support the answer. It does not mean the underlying claim is wrong; the missing document may exist and simply not have been uploaded.
Why separate
Listed on their own, so the count is impossible to miss.
In the Halden Robotics Ltd sample, 2 of 12 questions are red flags. The overall score is 68/100 and 7 answers are strong, which is a reasonable position for a first pass. But the two red flags concern subcontractor costs and grant treatment, both of which bear directly on how much of the claim qualifies and under which part of the scheme. A reader who only saw the score would not know that.
So red flags are shown in their own list in the report, with the reason and the matched evidence, and they are placed first in the fix plan regardless of their effort rating. The intent is that the people who sign off the claim see the handful of items most likely to be challenged before they see anything else.
What a red flag is not
A red flag is not a finding by a tax authority and not a prediction that an enquiry will be opened. It is creditARMOUR's observation that, on the documents uploaded, an answer would be hard to defend. The fix may be as simple as uploading a document you already hold.
It is also not a judgement on eligibility. creditARMOUR does not decide whether a project is R&D under your programme. It checks whether the file supports what you have said. The assessment scope page sets this out in full.
Worked examples
The two red flags in the Halden Robotics Ltd sample
Both come from a fictional UK claim under the merged scheme. Each shows the question, the evidence that was matched, why it was flagged, and what would change the rating.
- Red flag
UK04
Subcontracted R&D costs
Which subcontractor costs are claimed, and what did each contractor do?
Matched evidence: Three invoices, no agreements
Why it is flagged
The claim includes three subcontractor invoices, but the invoices describe “engineering services” and nothing else. There are no agreements or statements of work in the file. A reviewer would expect to see what each contractor was engaged to do and that the work was R&D carried out on the company’s behalf. The evidence that exists does not answer the question, and the evidence that would is missing.
What would change the rating
Signed agreements or statements of work for each subcontractor, showing the scope of work and that it was performed for Halden Robotics Ltd. With those attached the rating would be reassessed.
- Red flag
UK11
Grant and subsidy treatment
Did the project receive grants or subsidies, and how were they treated in the claim?
Matched evidence: Innovate UK grant letter
Why it is flagged
An Innovate UK grant letter is on file, so creditARMOUR knows part of the project was subsidised. The claim, however, does not identify which costs the grant covered. That is a contradiction between a document in the file and the claim as drafted, and it matters because subsidised costs can fall under a different part of the scheme.
What would change the rating
A reconciliation showing which claimed costs were met by the grant and how those costs have been treated in the claim workings.
Fix plan
How red flags feed the fix plan
Every red flag becomes an action in the fix plan, and red flags are placed at the top of the plan before any other action, whatever their effort rating. Within the red flags, and then within everything else, actions are ordered by impact and then by effort. The action links back to the question so you can see the evidence and the reason, and it carries an editable draft response.
In the sample, UK04 produces action FX3, “Attach subcontractor agreements”: high impact, low effort, because the documents probably exist and simply need to be found and uploaded. Once the agreements are in the file you re-score, and the rating is reassessed on the new evidence. See the fix plan for how ordering and assignment work.
- UK04Subcontracted R&D costsFX3Attach subcontractor agreementsImpact High · Effort Low
- UK11Grant and subsidy treatmentAction shown in the full fix plan
Scope
A simulation, not a review.
Rehearse the audit before it happens.
Choose your country, upload what you have and see where the claim stands in an afternoon.