Skip to content
creditARMOUR home

Canada mock audit

Rehearse a CRA review of your SR&ED claim.

Twelve simulated questions written for the Scientific Research and Experimental Development (SR&ED) tax incentive, evidence scoring against the records CRA expects, and a fix plan in the programme's own terms.

CRA · SR&ED

The question set

The twelve Canada questions

Grouped by theme and asked in the order a CRA review tends to follow. Each question says what it is testing.

Eligibility

  1. CA01Scientific or technological uncertaintyWhether line 242 of Form T661 states an uncertainty that could not be resolved from generally available knowledge, and why existing solutions did not meet the need.
  2. CA02Systematic investigationWhether line 244 and the records show a hypothesis, experiments or analysis to test it, and conclusions drawn, rather than trial and error or a systematic business process.
  3. CA03Advancement soughtWhether the work was undertaken to achieve a scientific or technological advancement beyond the existing knowledge base, and how line 246 describes what was achieved or attempted.
  4. CA04Excluded and support workHow work in paragraphs (e) to (k) of the definition, such as routine testing, commercial production and style changes, was separated from the SR&ED, and how support work was shown to be commensurate with the needs of the SR&ED.

Costs

  1. CA05Salary or wages of directly engaged employeesHow salary or wages on lines 300 to 309 were determined for each employee, the basis for the directly engaged proportion, and whether the specified employee limits (75 per cent and five times the YMPE) were applied.
  2. CA06Proxy or traditional method and the PPAWhich method was elected on Form T661, whether the salary base and 55 per cent prescribed proxy amount were calculated with the caps applied, or whether traditional-method overhead is directly attributable to SR&ED.
  3. CA07Contract paymentsFor SR&ED performed on the company's behalf, whether the performer is arm's length or non-arm's length, the work was performed in Canada, only 80 per cent of arm's-length payments entered qualified expenditures, and Form T1146 was used for non-arm's-length transfers.
  4. CA08Government assistance and contract payments receivedWhether government assistance (including provincial credits and programmes such as IRAP), non-government assistance and contract payments received or receivable were deducted from the pool and from qualified expenditures by project.

Records

  1. CA11Contemporaneous supporting evidenceWhether dated records made during the work exist for each project showing what was done, who did it, when, and how the expenditures were calculated, in line with CRA's examples.
  2. CA12Reconciliation to the T2 and financial statementsWhether the SR&ED expenditures, the pool of deductible expenditures and the ITC reconcile to the general ledger, the financial statements and the T2 return, and who approved the final figures.

Approval and filing

  1. CA09Form T661 completeness and claim preparer informationWhether Part 2 is complete for every project within the word limits, Parts 3 to 6 are filled in, Part 9 identifies each claim preparer and billing arrangement, and Part 10 is certified.
  2. CA10Schedule T2SCH31 and the reporting deadlineWhether Form T661 and Schedule T2SCH31 were filed within 18 months of the tax year end, the expenditure limit and phase-out were calculated correctly, and the ITC and refundable portion agree to the T2.

Evidence

What the file should hold

Seven evidence topics, each with the SR&ED rules, the documents that satisfy them and the red flags that follow when they are missing.

Local context

What Canada claims look like

The SR&ED programme is Canada's federal incentive for research and development. It gives a deduction against income for SR&ED expenditures and an investment tax credit (ITC) that is fully or partly refundable for many smaller companies. The CRA administers it, and the rules sit in the Income Tax Act, mainly subsection 248(1) and section 37 for the definition and the expenditure pool and section 127 for the ITC.

Read about the SR&ED

Examples from Canada claims

  • A Waterloo photonics company whose T661 Part 2 describes the uncertainty as whether a diffractive lens could hold focus across a 40-degree temperature range, and whose dated test logs show each hypothesis and result.
  • A Calgary software CCPC that elected the proxy method, so its claim rests on salary or wages of directly engaged employees plus the 55 per cent prescribed proxy amount rather than actual overhead.
  • A Montreal manufacturer that received an NRC IRAP contribution and had to show it deducted the assistance from qualified expenditures on Schedule T2SCH31 before calculating the ITC.

PRODUCT WALKTHROUGH

Northwind Optics Inc.

CRA · SR&ED

Upload the evidence you already hold

Add claim files

Narratives, workings, contracts, timesheets

  • Project planning documents and design of experiments Added
  • Lab notebooks, engineering logs, source code and version history with dates Added
  • Payroll register and T4 summary for each claimed employee Added
  • Signed agreements and statements of work for each SR&ED contractor Added

Step 1 of 5 · fictional sample data

A SR&ED mock audit for Northwind Optics Inc., a fictional company. Pause at any step.

In the United States? Visit creditarmor.ai

Rehearse the CRA review before it happens.

Start a Canada assessment, answer the simulated questions and see where the file stands.