The SR&ED rules
- The uncertainty must be scientific or technological, not commercial or financial, and must be one that generally available knowledge could not resolve.
- The work must show a systematic investigation: hypothesis, experiment or analysis, results and conclusions. A systematic approach to a business task is not enough.
- The advancement is tested by whether the work attempted to generate new knowledge; failure to achieve the objective does not disqualify it.
- Excluded work in paragraphs (e) to (k) is identified after the eligible work, and the purpose of each activity determines which side it falls on.
Documents that satisfy them
Upload whichever of these you hold. Dated records made during the period rate higher than reconstructions, and reconstructions rate higher than estimates.
- Project planning documents and design of experiments
- Lab notebooks, engineering logs, source code and version history with dates
- Test protocols, data, results, analysis and conclusions
- The Part 2 project descriptions as filed on Form T661
Red flags
These produce a Red flag rating on the related questions until they are cleared.
- Part 2 written at claim time with no dated records behind it
- Uncertainty described as a commercial target or as something already solved in the field
Questions this evidence feeds
In the Canada question set this topic supports the following questions. The sample rating shows how the fictional Northwind Optics Inc. file scored on each.
- CA01Scientific or technological uncertaintyWhether line 242 of Form T661 states an uncertainty that could not be resolved from generally available knowledge, and why existing solutions did not meet the need.Strong
- CA02Systematic investigationWhether line 244 and the records show a hypothesis, experiments or analysis to test it, and conclusions drawn, rather than trial and error or a systematic business process.Strong
- CA03Advancement soughtWhether the work was undertaken to achieve a scientific or technological advancement beyond the existing knowledge base, and how line 246 describes what was achieved or attempted.Strong
- CA04Excluded and support workHow work in paragraphs (e) to (k) of the definition, such as routine testing, commercial production and style changes, was separated from the SR&ED, and how support work was shown to be commensurate with the needs of the SR&ED.Needs work
See all twelve on Canada draft audit questions. The questions are a simulation; nothing is sent to CRA, and a rating is not a decision by CRA.
Related
- Canada payroll and staff cost evidenceCanada (Canada Revenue Agency (CRA)): What payroll, contract and pension records support staff costs in a claim.
- Canada time allocation evidenceCanada (Canada Revenue Agency (CRA)): How staff time on R&D is recorded and apportioned, and what records support the split.
- Canada contracts and invoices evidenceCanada (Canada Revenue Agency (CRA)): Agreements and invoices for subcontractors, external staff and suppliers, and what they must show.
- Canada evidence checklistThe evidence a Canada SR&ED Tax Incentive Program claim should hold, by topic: payroll, time records, project records, contracts and calculations.