The evidence readiness score
The evidence readiness score runs from 0 to 100. A higher score means more of your answers are backed by the documents you uploaded; a lower score means more answers are unsupported or contradicted. It describes the state of your evidence today, not the likelihood of an audit or the outcome of one.
The score is a summary of the question-level results underneath it. Each question is rated on how well the uploaded documents support the answer given, and those ratings are combined into one number from 0 to 100. The risk methodology page explains how the ratings are weighted.
Worked example
The sample report for Halden Robotics Ltd, a fictional company claiming under the R&D Tax Relief (Merged Scheme) for the accounting period ending 31 march 2025, scores 68/100. That number comes from 12 questions: 7 rated strong, 3 rated needs work and 2 red flags.
Read in the direction the wording sets out: at the top of the range, most answers are supported by evidence you have uploaded. At the bottom, many answers lack supporting evidence or are contradicted by it. Halden sits in the middle: most of its eligibility answers are well supported, but two cost questions have no usable evidence behind them, and that is what the fix plan addresses.
The three statuses
Every question receives one of three statuses. The status describes the relationship between your answer and your documents, not the quality of the underlying work or the merits of the claim.
Strong
The answer is supported by at least one uploaded document that says what the answer says, and nothing on file contradicts it. In the sample, UK05 (claim calculation reconciles) is strong because the evidence is claim workings, ct600, trial balance, and every line of qualifying expenditure traces to a nominal ledger code and the total agrees with the computation.
Needs work
The answer is plausible and partly supported, but the documents are thin, late or indirect. Typical causes are year-end estimates where contemporaneous records would be expected, assertions in a narrative with no underlying record, or a document that exists but does not address the point the question asks. In the sample, UK03 (staff time allocation records) needs work because percentages are estimates made at year end. No timesheets or contemporaneous records support the split.
Red flag
Either there is no evidence for the answer at all, or a document on file contradicts it. These are listed separately because a reviewer would be likely to pursue them first. In the sample, UK04 (subcontracted r&d costs) is a red flag because the evidence is three invoices, no agreements, and invoices describe 'engineering services' only. No contracts or statements of work show that the work was R&D performed on the company's behalf.
Statuses change when the evidence changes. Adding a document and re-scoring is the intended way to move a question from needs work to strong. See evidence scoring for how documents are matched to questions.
Red flags
Red flags are shown at the top of the report, before the question list, because they are the items that most need attention regardless of the overall score. A claim can score reasonably well and still carry a red flag that would dominate a real enquiry.
The Halden Robotics Ltd sample has 2:
- UK04 – Subcontracted R&D costs. Invoices describe 'engineering services' only. No contracts or statements of work show that the work was R&D performed on the company's behalf.
- UK11 – Grant and subsidy treatment. A grant covering part of the project is on file but the claim does not identify which costs were subsidised. This affects the scheme the costs fall under.
Both are cost questions, and both are cases where a document exists but does not do the job the claim needs it to do. That pattern is common: the gap is rarely that nobody kept anything, and more often that what was kept does not say the specific thing a reviewer would ask about. The red flags feature page describes the two triggers in more detail.
The fix plan
The fix plan turns the question-level results into a list of actions. Each action is linked to the question it addresses and carries two ratings: impact, meaning how much the action would improve the evidence position if completed, and effort, meaning roughly how much work it is likely to take. Actions are ordered so that high-impact, low-effort items come first.
For the sample, the top of the plan reads:
- Attach subcontractor agreements (UK04; impact high, effort low). Obtain the signed agreements or statements of work for each of the three subcontractors and confirm that the work was carried out on the company's behalf.
- Rebuild time allocation (UK03; impact high, effort medium). Reconstruct the R&D time split from calendars, ticketing history and sprint records, and have each lead confirm their team's percentages.
- Separate routine work (UK07; impact medium, effort medium). List the tasks treated as routine and show how their hours were removed from the claim.
- Record approval of final figures (UK12; impact low, effort low). Already supported. Keep the board minute extract with the claim file.
Two things to notice. First, the order is not the order of the questions: UK04 comes first because obtaining three signed agreements is quick and removes a red flag. Second, the plan includes an item that is already supported (UK12) with a reminder to keep the document with the file. The plan is a to-do list for the claim file, not only a list of failures.
Effort ratings are estimates based on the type of document involved. Reconstructing time records from calendars and sprint history is rated medium because it depends on what systems you have; your own estimate may differ. The fix plan feature page has more on how the ratings are set.
Draft responses
For each question, the results include an editable draft response written in the language of the programme. The draft is built from your answer and the evidence that supports it, and it is marked draft, not sent until you choose to do something with it.
Drafts describe the position you would be in once the fix plan is complete, not necessarily the position today. The sample draft for UK04 states that each subcontractor was engaged under a written agreement, even though the question is currently a red flag because those agreements are not on file. The draft is telling you what you need to be able to say, and therefore what you need to obtain. If you cannot obtain it, the draft must change.
What the results are not
It is as important to know what the results do not tell you as what they do.
- Not an audit probability. The score measures how well your documents support your answers. It does not estimate whether a tax authority will select your claim for enquiry, and it has no information about how authorities choose.
- Not an authority decision. A "strong" status means the evidence on file supports the answer. It does not mean a tax authority would accept the answer, the costs or the eligibility of the project. Only the authority can decide that, and only through its own process.
- Not tax advice. The questions, statuses and drafts are generated from your inputs against a programme-specific question set. They do not take account of your wider circumstances and they are not a substitute for a qualified adviser.
- Not an official request. The questions are simulated. Nothing about a mock audit creates an obligation to respond to anyone, and no tax authority is involved or informed.
The assessment scope page sets out these limits in full, and the FAQ covers the questions people most often ask after a first run.
Related
- Risk methodologyHow the evidence readiness score and status ratings are produced, and what they do and do not mean.
- Risk reportThe summary report with the evidence readiness score, question-by-question results and the top fixes.
- Sample reportA full fictional risk report for Halden Robotics Ltd (UK): 12 questions, 68/100, red flags and top fixes.
- FAQAnswers to common questions about mock audits, scores, data handling and draft responses.