Skip to content
creditARMOUR home

Canada sample report

Risk report: Northwind Optics Inc.

A complete mock audit result for a fictional Canada company claiming under the Scientific Research and Experimental Development (SR&ED) tax incentive. Every name, figure and document on this page is invented.

Sample, fictional dataCRA · SR&ED

Summary

Generated 14 November 2026

EVIDENCE READINESS

68/100

Strong
7 of 12
Need work
3 of 12
Red flags
2 of 12

A higher score means your evidence supports more of your answers.

Company
Northwind Optics Inc.
Programme
Scientific Research and Experimental Development (SR&ED) tax incentive
Authority
Canada Revenue Agency
Period
Tax year ended 31 December 2024
Claim
Fictional claim of CAD 1,240,000 qualified SR&ED expenditures at the enhanced 35 per cent rate
Questions answered
12 of 12

The Part 2 descriptions are technical and backed by dated test records, the proxy method working is complete and both forms were filed well inside the 18-month deadline. The file is weakest on third-party costs and assistance: one contract payment has no agreement and includes work performed in the United States, and an IRAP contribution was not deducted from qualified expenditures. Three further answers rely on year-end estimates or incomplete analysis.

Question-by-question results

12 questions
RefQuestionEvidence matchedStatus
CA01

Scientific or technological uncertainty

Whether line 242 of Form T661 states an uncertainty that could not be resolved from generally available knowledge, and why existing solutions did not meet the need.

The uncertainty is framed as whether a diffractive lens could hold focus across a 40-degree temperature range, with the reasons existing coatings and substrates did not meet the need.

Form T661 Part 2, line 242; optical design review notes dated March 2024Strong
CA02

Systematic investigation

Whether line 244 and the records show a hypothesis, experiments or analysis to test it, and conclusions drawn, rather than trial and error or a systematic business process.

Hypotheses, test runs and conclusions are recorded in dated documents, and the second hypothesis is shown to have failed before the third was adopted.

Line 244; test protocol TP-07; thermal cycling data and analysis memoStrong
CA03

Advancement sought

Whether the work was undertaken to achieve a scientific or technological advancement beyond the existing knowledge base, and how line 246 describes what was achieved or attempted.

The advancement is stated in terms of what was learned about substrate behaviour, including the limit of the result at production scale.

Line 246; engineering summary dated 9 December 2024Strong
CA04

Excluded and support work

How work in paragraphs (e) to (k) of the definition, such as routine testing, commercial production and style changes, was separated from the SR&ED, and how support work was shown to be commensurate with the needs of the SR&ED.

The description asserts that pilot-run production and routine QA testing were excluded, but the hours removed and the basis for treating remaining test work as support work are not shown.

Form T661 Part 2; project planNeeds work
CA05

Salary or wages of directly engaged employees

How salary or wages on lines 300 to 309 were determined for each employee, the basis for the directly engaged proportion, and whether the specified employee limits (75 per cent and five times the YMPE) were applied.

Directly engaged percentages are year-end estimates with no time records. The CEO is a specified employee and the five-times-YMPE limit has been applied, but the 75 per cent cap is not documented.

Payroll register; management estimate spreadsheetNeeds work
CA06

Proxy or traditional method and the PPA

Which method was elected on Form T661, whether the salary base and 55 per cent prescribed proxy amount were calculated with the caps applied, or whether traditional-method overhead is directly attributable to SR&ED.

The proxy method was elected, the salary base excludes bonuses and taxable benefits, and the PPA is calculated at 55 per cent with the overall cap tested.

Form T661 line 160; Part 5 working; salary base scheduleStrong
CA07

Contract payments

For SR&ED performed on the company's behalf, whether the performer is arm's length or non-arm's length, the work was performed in Canada, only 80 per cent of arm's-length payments entered qualified expenditures, and Form T1146 was used for non-arm's-length transfers.

Invoices describe 'coating trials' only. There is no agreement showing SR&ED was performed on the company's behalf, and the laboratory's correspondence indicates part of the work was done at its Rochester, New York facility.

Two invoices from a coating laboratory; no agreementRed flag
CA08

Government assistance and contract payments received

Whether government assistance (including provincial credits and programmes such as IRAP), non-government assistance and contract payments received or receivable were deducted from the pool and from qualified expenditures by project.

A CAD 180,000 IRAP contribution relates to the claimed project but no amount appears on lines 513 to 517; qualified expenditures and the ITC are overstated.

NRC IRAP contribution agreement; Form T661 Part 4Red flag
CA09

Form T661 completeness and claim preparer information

Whether Part 2 is complete for every project within the word limits, Parts 3 to 6 are filled in, Part 9 identifies each claim preparer and billing arrangement, and Part 10 is certified.

Part 2 is complete for both projects within the word limits, Part 9 names the consultant with business number and contingency billing code, and Part 10 is certified.

Form T661 as filed; Part 9 table; engagement letterStrong
CA10

Schedule T2SCH31 and the reporting deadline

Whether Form T661 and Schedule T2SCH31 were filed within 18 months of the tax year end, the expenditure limit and phase-out were calculated correctly, and the ITC and refundable portion agree to the T2.

Both forms were filed with the T2, a year before the 30 June 2026 reporting deadline. The $3 million expenditure limit and $10 million taxable capital threshold apply because the tax year began before 16 December 2024.

T2 filing confirmation dated 27 June 2025; Schedule T2SCH31Strong
CA11

Contemporaneous supporting evidence

Whether dated records made during the work exist for each project showing what was done, who did it, when, and how the expenditures were calculated, in line with CRA's examples.

Project 1 has dated records throughout. Project 2 relies on a final report written in January 2025 with few dated records from the year.

Test protocols and data for project 1; sparse records for project 2Needs work
CA12

Reconciliation to the T2 and financial statements

Whether the SR&ED expenditures, the pool of deductible expenditures and the ITC reconcile to the general ledger, the financial statements and the T2 return, and who approved the final figures.

Every Part 3 line traces to general ledger accounts, the pool and ITC agree to the T2, and approval of the final figures is minuted.

Claim workings by T661 line; trial balance; T2 Schedule 1; board resolutionStrong

Red flags

Draft response for CA07

Top fixes

Ordered by impact, then effort
  1. FX1

    Deduct the IRAP contribution from qualified expenditures relates to CA08

    Allocate the CAD 180,000 contribution to the project it funded, enter it on the government assistance line in Part 4, and recalculate Schedule T2SCH31.

    ImpactHighEffortLow
  2. FX2

    Obtain the coating laboratory agreement and split the work by location relates to CA07

    Get the signed agreement or statement of work, confirm arm's-length status, identify the portion performed in Canada, remove the Rochester portion and apply the 80 per cent restriction to the remainder.

    ImpactHighEffortLow
  3. FX3

    Rebuild directly engaged time support relates to CA05

    Reconstruct each employee's SR&ED proportion from the issue tracker, lab schedule and calendars, document the 75 per cent cap for the CEO, and have each lead confirm in writing.

    ImpactHighEffortMedium
  4. FX4

    Assemble dated records for project 2 relates to CA11

    Collect the 2024 test data, emails and commit history behind the January 2025 report and index them to lines 242 and 244.

    ImpactMediumEffortMedium
  5. FX5

    Show how excluded work was removed relates to CA04

    List the pilot-run and QA activities treated as excluded, show the hours removed, and explain why the remaining test work is support work commensurate with the SR&ED.

    ImpactMediumEffortLow

See this for your own Canada claim.

Start an assessment, answer the simulated questions and see where the file stands.