Technical records behind Part 2
For each project, assemble the dated records the CRA lists as examples: planning documents, design of experiments, lab notebooks or engineering logs, source code history, test protocols, data, results, analysis and conclusions. Map each to the uncertainty on line 242 and the work on line 244. Going forward, record hypotheses and results as the work happens; a dated entry in the existing issue tracker or notebook is enough.
- Dated records attached to each uncertainty
- Hypothesis and result recorded for each experiment
- Technical lead named for each project
Salary, time and the method election
Rebuild the directly engaged proportion for each employee from time sheets, tracker history and calendars, and have each lead confirm in writing. Identify specified employees from the share register and apply the 75 per cent and five-times-YMPE limits. Record the method election and keep the PPA working with the caps applied.
- Per-employee time support with a stated basis
- Specified employees identified and limited
- PPA or overhead working kept with the file
Contracts, assistance and the forms
Obtain signed agreements and statements of work for every SR&ED contractor, confirm arm's-length status and where the work was performed, and apply the 80 per cent restriction or Form T1146 as appropriate. List every grant, contribution, subsidy and provincial credit received, receivable or expected, and deduct it by project. Finally, check that Part 9 names every paid preparer and that Schedule T2SCH31 agrees to Form T661.
- Agreement and location of work per contractor
- Assistance deducted by project
- Part 9 complete and Schedule 31 reconciled
Related
- Canada T661 and reporting deadline guideCompleting Form T661 and Schedule 31 and meeting the 18-month reporting deadline.
- Canada existing enquiry guideCanada (SR&ED Tax Incentive Program): What to do when the authority has already opened a review or enquiry into a claim.
- Canada evidence checklistThe evidence a Canada SR&ED Tax Incentive Program claim should hold, by topic: payroll, time records, project records, contracts and calculations.