Skip to content
creditARMOUR home

Guides

Canada: Improving the evidence in a Canada file

Between a first mock audit and a re-score, the work is to turn estimates into records and assertions into documents. For Canadian claims the highest-value improvements are usually dated technical records behind Part 2, per-employee time support, contractor agreements and the assistance working.

Last updated

Technical records behind Part 2

For each project, assemble the dated records the CRA lists as examples: planning documents, design of experiments, lab notebooks or engineering logs, source code history, test protocols, data, results, analysis and conclusions. Map each to the uncertainty on line 242 and the work on line 244. Going forward, record hypotheses and results as the work happens; a dated entry in the existing issue tracker or notebook is enough.

  • Dated records attached to each uncertainty
  • Hypothesis and result recorded for each experiment
  • Technical lead named for each project

Salary, time and the method election

Rebuild the directly engaged proportion for each employee from time sheets, tracker history and calendars, and have each lead confirm in writing. Identify specified employees from the share register and apply the 75 per cent and five-times-YMPE limits. Record the method election and keep the PPA working with the caps applied.

  • Per-employee time support with a stated basis
  • Specified employees identified and limited
  • PPA or overhead working kept with the file

Contracts, assistance and the forms

Obtain signed agreements and statements of work for every SR&ED contractor, confirm arm's-length status and where the work was performed, and apply the 80 per cent restriction or Form T1146 as appropriate. List every grant, contribution, subsidy and provincial credit received, receivable or expected, and deduct it by project. Finally, check that Part 9 names every paid preparer and that Schedule T2SCH31 agrees to Form T661.

  • Agreement and location of work per contractor
  • Assistance deducted by project
  • Part 9 complete and Schedule 31 reconciled