Why map evidence to statements
A claim is a set of statements: this project sought this advance; these people spent this share of their time on it; these costs were incurred for it; these figures were approved on this date. A reviewer tests the claim by picking statements and asking what supports them. If the answer to that question has to be worked out from scratch each time, under time pressure, with the people who knew having moved on, the claim is in a weak position however good the underlying work was.
An evidence map answers the question in advance. For each statement it records which document supports it, where in that document the support is found, and who in the organisation is responsible for the document. Building the map is also the quickest way to find out which statements have nothing behind them, which is exactly what a mock audit will surface as a needs-work or red-flag status.
The map does not need to be elaborate. A spreadsheet with four columns, kept with the claim file, is enough. What matters is that it exists before it is needed and that someone owns it.
The map: one row per statement
The example below uses statements from the fictional Halden Robotics sample. Each row is one statement the claim depends on. Note that the fourth row describes a document the sample company does not yet have on file; that is what the map is for.
| Statement in the claim | Supporting document | Where in the document | Owner |
|---|---|---|---|
| The project sought to resolve an uncertainty in compliant grip control that published methods did not address. | Project narrative v3 | Sections 2 and 3 | Head of Engineering |
| Existing approaches were reviewed before the project started and found insufficient. | Literature review memo; competitor teardown notes | Memo pp. 1–4; teardown summary table | Head of Engineering |
| Engineering staff spent the stated proportion of their time on the project. | Sprint and ticketing export; lead confirmations | Export filtered by project tag; confirmation emails dated June 2025 | Finance |
| Three subcontractors carried out defined parts of the R&D on the company's behalf. | Signed agreements and statements of work (one per subcontractor) | Scope clause and deliverables schedule in each | Finance / Legal |
| The claimed amounts reconcile to the accounts and the computation. | Claim workings; trial balance; filed computation | Reconciliation tab; nominal codes 7100–7180 | Finance |
| The final claim figures were approved before submission. | Board minute extract | Minute 4, meeting of 12 September 2025 | Company Secretary |
Statement
Write the statement as the claim makes it, in one sentence, so that it can be tested as true or false. "Staff time" is a topic; "engineering staff spent the stated proportion of their time on the project" is a statement. Start with the statements a reviewer is most likely to test: eligibility of the project, the basis of each cost category, reconciliation to the accounts, and approval.
Document
Name the specific document, with its version, as it appears in the file. If more than one document is needed to support a statement, list them all. If no document exists, write "none" rather than leaving the cell empty: the empty cells are the ones that get forgotten.
Where in the document
A page, section, tab, clause or date range. A reviewer given a 60-page contract and told "the scope is in there" will form a view about how well the file is managed. "Schedule 2, paragraphs 1 to 4" takes thirty seconds to write and saves the reader ten minutes.
Owner
The role, not just the person, who holds the document and can explain it. People leave; roles persist. The owner column also tells you who to ask when a document needs to be produced or updated.
Types of evidence by theme
Different statements are supported by different kinds of record, and they come from different parts of the organisation. Grouping the map by theme makes it easier to see where a whole category is thin.
Eligibility
- Project narrative or technical report, with version history
- Literature or prior-art review, competitor analysis, patent searches
- Design documents, architecture decisions, specifications and their revisions
- Test plans, test results, experiment logs, including failed attempts
- CV or role description of the competent professional, and any sign-off memo
Costs
- Claim workings showing each cost category and its apportionment basis
- Payroll extracts limited to the staff and fields the claim uses
- Subcontractor and agency agreements, statements of work and the matching invoices
- Purchase ledger extracts for consumables and software, with usage or allocation notes
- Grant agreements, funding letters and the analysis of how subsidised costs were treated
Records
- Timesheets or time-tracking exports, by person and project
- Sprint, ticketing and version-control history filtered to the project
- Lab notebooks, meeting notes, decision logs, dated correspondence
- Calendar records used to reconstruct time where no timesheets exist
Approval
- Board or director minutes approving the claim figures
- Adviser engagement letters and review sign-offs
- The filed computation or return, and the submission confirmation
The evidence page describes how each type is weighed in a mock audit, and preparing files covers formats and naming.
Contemporaneous and reconstructed records
A contemporaneous record was created at the time the thing it records happened, for a purpose other than supporting the claim: a timesheet filled in each week, a test report written on the day of the test, a board minute taken at the meeting. A reconstructed record was created later, usually at claim time, by working back from other sources: a time split estimated from memory, a narrative written from sprint history, a cost allocation built from calendars.
Contemporaneous records carry more weight for an obvious reason: they could not have been shaped by knowledge of what the claim needed them to say. In the Halden sample, the difference between the strong rating on reconciliation and the needs-work rating on staff time is almost entirely this. The ledger is a contemporaneous record; the year-end percentage estimate is not.
Reconstructed records are not worthless, and for many small companies they are all that exists for the first claim. Three things make a reconstruction more credible:
- Say that it is reconstructed, when, by whom and from what sources. A reconstruction presented as if it were contemporaneous is a red flag if the reviewer notices; a reconstruction labelled as such is simply weaker evidence.
- Anchor it to something contemporaneous. A time split derived from ticketing history and confirmed by each team lead is far stronger than one estimated by the finance team alone.
- Fix the underlying process so that next year's record is contemporaneous. The map tells you which processes to fix.
Keeping the map current
A map built once at claim time and then forgotten has done half its job. The other half is being ready when a question arrives, which may be a year or more after filing. Four habits keep it useful.
- Update it when the file changes. When a narrative is revised, a contract is signed or a figure is corrected, change the row the same day. Treat the map as part of the claim file, not a one-off exercise.
- Re-run the mock audit after each batch of changes. The results tell you whether the new documents actually closed the gap, and which rows still read "none". See understanding results.
- Review the owner column at least annually. When a role changes hands, the new holder should know which rows they own and where the documents are kept.
- Keep the map for as long as the claim can be questioned. Enquiry windows vary by programme and are often several years. The map and the documents it points to should be retained for the whole period; check your programme's record-keeping requirements with your adviser.
For claims with several projects, keep one map per claim with a project column, rather than one map per project. A reviewer's questions tend to cut across projects, especially on costs, and a single map is easier to answer from.
Related
- EvidenceWhat counts as evidence in a mock audit, what to upload and how documents are matched to questions.
- Preparing filesFile types, naming, size limits and how to organise evidence so it matches questions.
- Project narrative guideHow to write a technical narrative that answers the questions an audit tends to ask.
- Evidence scoringHow each answer is matched to uploaded evidence and rated strong, needs work or red flag.