Singapore risk report.
The summary report with the score, question-by-question results and top fixes.
RISK REPORT · SG
Tanjong Photonics Pte. Ltd.
EVIDENCE READINESS
68/100
- Strong
- 7
- Need work
- 3
- Red flags
- 2
Contents
What the report contains
The Singapore report follows the R&D Claim Form structure so a director can compare it with what was filed or retained.
- Summary, score and counts
- Results by question, SG01 to SG12
- Red flags and top fixes with impact and effort
The report brings the score, the question-by-question results, the red flags and the top fixes together for your team, your board or your adviser. See the full Singapore sample report.
In the sample
Tanjong Photonics Pte. Ltd. report card
RISK REPORT · SG
Tanjong Photonics Pte. Ltd.
EVIDENCE READINESS
68/100
- Strong
- 7
- Need work
- 3
- Red flags
- 2
Reading it
How to read the report
Start with the question-by-question results, not the headline number. In the sample, Tanjong Photonics Pte. Ltd. scores 68/100 (Year of Assessment 2025 (basis period ended 31 December 2024)): 7 of 12 answers are strong, 3 need work and 2 are red flags. The red flags are SG07 (Outsourced R&D and the 60 per cent rule) and SG08 (Singapore and overseas costs kept separate), and they are where the report tells the reader to begin.
The evidence readiness score runs from 0 to 100. A higher score means more of your answers are backed by the documents you uploaded; a lower score means more answers are unsupported or contradicted. It describes the state of your evidence today, not the likelihood of an audit or the outcome of one.
Scores describe evidence readiness. They are not audit probabilities and not decisions of any tax authority. It says nothing about whether IRAS will open a review of a R&D deductions (EIS) claim, and nothing about how one would end.
Read in this order
- Red flags: answers contradicted by a document, or with none behind them
- Needs work: answers resting on estimates or partial records
- Top fixes: the actions with the most impact for the least effort
- Unassessed areas: what the question set did not test
- The score last, as a summary of the above
Audience
Who uses the report, and when
Finance
Uses the cost-side results to see which amounts in the R&D deductions (EIS) claim are tied to source records and which rest on estimates, ideally while there is still time to act. One Singapore date to keep in view: Corporate Income Tax Return (Form C-S / Form C-S (Lite) / Form C) (30 November each year for the YA).
The technical lead
Uses the activity-side results to see which project records would let an outside reader follow the work, and which exist only in people's heads.
Your adviser
Uses the report as a structured starting point for their own review. The report does not replace that review, and it does not give advice. The improving evidence guide describes what to do between one report and the next.
Common mistakes
- Reading the score as a forecast of what IRAS will decide
- Circulating the headline number without the question results
- Treating a strong rating as proof that the claim is correct
- Leaving a known R&D deductions (EIS) trigger unresolved. Example: Overseas staff costs or consumables included in the additional or enhanced deduction
- Rewriting an answer to change a rating without adding the document
Quick answers
About the Singapore risk report
It is written for your own team and your adviser. It is a simulation result, not a submission, and creditARMOUR has no feature that sends anything to IRAS. If IRAS opens a review, the report shows you which records to gather first; what you send is your decision, taken with your adviser.
A PDF, generated from the assessment, with the simulation disclaimer printed on every page so that it cannot be mistaken for a document from IRAS.
No. It covers the 12 simulated questions. Areas outside the question set are listed in the report as unassessed, including "Overseas R&D cost allocation" and "EIS activities other than R&D (IP registration, training, innovation projects)". Those points should go to a qualified adviser.
After each round of fixes. A report is a snapshot of the file on the day it was produced; adding a document and re-scoring gives a new report, and comparing the two shows what the work achieved.
Scope
A simulation, not a review
Rehearse the IRAS review before it happens.
Start an assessment, answer the simulated questions and see where the file stands.