A Ireland mock audit, step by step.

The same four steps as every creditARMOUR mock audit, with the uploads, questions and ratings adapted to the R&D Tax Credit.

Revenue · R&D Tax Credit

The four steps

From upload to fix plan for a Ireland claim

  1. Step 1: Upload claim and evidence

    Irish uploads usually start with the Form CT1 R&D panel, the per-project science files and the credit computation, plus payroll, grant letters and any subcontractor agreements and notifications.

  2. Step 2: Answer simulated audit questions

    The Irish set has twelve questions grouped as science test, accounting test, and forms and records, in the order Revenue tends to ask them.

  3. Step 3: See evidence scores and red flags

    Ratings follow Revenue's evidence expectations in Tax and Duty Manual Part 29-02-03: dated records, time records and reconciled workings carry the most weight.

  4. Step 4: Get a fix plan and draft responses

    The fix plan links each action to an IE question and gives a draft in Revenue's terms, which stays with you.

Step 2 in detail

The questions you will answer

The Irish set follows the order of a Revenue intervention: science test first, then the accounting test, then the forms. The questions are a simulation modelled on Revenue's published manual; they are not Revenue's questions.

Eligibility

  1. IE01Systematic, investigative or experimental activityWhether the work was planned and carried out in a logical sequence to a recognised methodology, with dated records of goals, progress, methods and conclusions rather than only outcomes.
  2. IE02Field of science or technology and category of R&DWhether each project is placed in a field listed in S.I. No. 434 of 2004 and classified as basic research, applied research or experimental development, with the reasoning recorded.
  3. IE03Advancement sought and uncertainty resolvedWhether the scientific or technological advancement sought and the uncertainty to be resolved are stated for each project, and when the uncertainty was resolved so that the R&D phase has an end date.
  4. IE04State of knowledge and competent professionalWhat was done before the project began to show that the advance was not already achieved or available to a competent professional in the field, and the qualifications and experience of the project manager and team.

Costs

  1. IE05Emoluments and time apportionmentHow the emoluments of staff carrying on R&D were calculated, how the proportion of time spent on qualifying activity was determined and recorded, and who reviewed the split.
  2. IE06Wholly and exclusively costsWhether overheads, materials, rent, cloud computing and plant or machinery were apportioned on a reasonable basis to the R&D activity and the method documented, with costs after the R&D phase excluded.
  3. IE07Subcontracted R&D and written notificationFor payments to universities, institutes of higher education or unconnected third parties, whether the greater-of 15 per cent or €100,000 limits were applied separately, and whether each subcontractor was notified in writing that it may not claim the credit.
  4. IE08Grant-funded expenditure excludedWhether expenditure met directly or indirectly by grant or other assistance from the State, the EU, an EEA state, the UK or another state was deducted, and whether the Form CT1 figures are net of that assistance.

Records

  1. IE11Qualifying company, location and groupWhether the company is within the charge to Irish corporation tax, where the R&D was carried on (Ireland, EEA or UK), whether the expenditure is deductible elsewhere, and how group expenditure was allocated under the 51 per cent group rules.
  2. IE12Accounting test reconciliation and record integrityWhether each line of the claim traces to the general ledger and the accounts with no general or admin expense lines, and whether records show their author and date of creation.

Approval and filing

  1. IE09Pre-filing notificationWhether the company needed to notify Revenue (first claim, or no claim in the previous three accounting periods) and, if so, whether Form 766C was sent through MyEnquiries at least 90 days before the claim was made.
  2. IE10Form CT1 claim and instalment specificationsWhether the claim was made on the Form CT1 within 12 months of the end of the accounting period, whether the R&D panel is complete, and whether the specification for each instalment (offset or payment) was made on the right return.

Step 3 in detail

How answers are rated

For Irish claims the evidence that moves a rating most is dated per-project records, time records and subcontractor notifications, because those are what Revenue's manual says it expects to see.

The evidence readiness score runs from 0 to 100. A higher score means more of your answers are backed by the documents you uploaded; a lower score means more answers are unsupported or contradicted. It describes the state of your evidence today, not the likelihood of an audit or the outcome of one.

What moves a rating in Ireland

  • Dated records outrank narrative written at claim time
  • State-of-knowledge searches saved at the start outrank later recollection
  • Written notifications and limit workings outrank invoices

Local examples

  • A Galway medical device company whose uncertainty was whether a microfluidic cartridge could hold calibration tolerance at manufacturing scale, with dated bench-test records to show the point at which the uncertainty was resolved.
  • A Cork software company claiming for the first time, which had to send Form 766C through MyEnquiries at least 90 days before filing its Form CT1 and then tick the pre-filing box on the R&D panel.
  • A Limerick engineering firm that paid a university €120,000 for test work and had to apply the greater-of 15 per cent or €100,000 limit and give the university written notice that it could not claim the credit itself.

Rehearse the Revenue review before it happens.

Start an assessment, answer the simulated questions and see where the file stands.