United Kingdom red flags.
The triggers that produce a red flag for this programme and what would clear them.
RED FLAGS · UK
Halden Robotics Ltd
- UK07Contracted-out R&DRed flag
Invoices describe 'engineering services' only. No contracts or statements of work show what was commissioned or that the company bore the risk.
- UK08Overseas expenditureRed flag
An overseas subcontractor cost is included with no documented reason why the work had to take place outside the UK.
Triggers
What produces a red flag in United Kingdom
Six UK triggers produce a red flag, from missing subcontractor agreements to a late claim notification.
Subcontractor costs with no agreement or statement of work
Without an agreement HMRC cannot see what was commissioned or who bore the risk, so the contracted-out rules cannot be applied.
Clears when: Signed agreements and statements of work for each subcontractor, matched to the invoices.
UK07
Overseas EPW or subcontractor costs included without a stated exception
From April 2024 these costs are excluded unless a specific exception applies, and cost or availability is not one.
Clears when: Either remove the costs or document the conditions that make the overseas location necessary.
UK08
Claim notification required but not submitted in time
A late or missing notification invalidates the claim for that period.
Clears when: Evidence that no notification was needed (a claim in the previous three years) or the submission receipt.
UK09
Additional Information Form submitted after the CT600, or totals that disagree
HMRC removes claims where the AIF is missing, and inconsistencies prompt a compliance check.
Clears when: The AIF acknowledgement dated before the CT600 and a reconciliation of the totals.
UK10 · UK12
ERIS claimed without evidence of the 30 per cent intensity condition
ERIS depends on a calculation across total expenditure; without it the enhanced rates are not available.
Clears when: An intensity working from the accounts, including connected companies.
UK11
Uncertainty described as commercial, or as already solved in the field
The definition requires scientific or technological uncertainty that a competent professional could not readily resolve.
Clears when: A restated uncertainty with the baseline of existing knowledge and the competent professional's reasoning.
UK01 · UK02 · UK03
In the sample
Halden Robotics Ltd: 2 of 12 flagged
RED FLAGS · UK
Halden Robotics Ltd
- UK07Contracted-out R&DRed flag
Invoices describe 'engineering services' only. No contracts or statements of work show what was commissioned or that the company bore the risk.
- UK08Overseas expenditureRed flag
An overseas subcontractor cost is included with no documented reason why the work had to take place outside the UK.
- Each trigger states what would clear it
- Red flags appear first in the fix plan
- Triggers are reviewed when HMRC guidance changes
Scope
A simulation, not a review
Rehearse the HMRC review before it happens.