A United Kingdom mock audit, step by step.

The same four steps as every creditARMOUR mock audit, with the uploads, questions and ratings adapted to the Merged scheme / ERIS.

HMRC · Merged scheme / ERIS

The four steps

From upload to fix plan for a United Kingdom claim

  1. Step 1: Upload claim and evidence

    UK uploads usually start with the AIF, the CT600L and the technical narrative, plus payroll and any subcontractor agreements.

  2. Step 2: Answer simulated audit questions

    The UK set has twelve questions grouped as eligibility, costs, forms and records, in the order HMRC tends to ask them.

  3. Step 3: See evidence scores and red flags

    Ratings follow HMRC's evidence expectations: dated records, agreements and time records carry the most weight.

  4. Step 4: Get a fix plan and draft responses

    The fix plan links each action to a UK question and gives a draft in HMRC's terms, which stays with you.

Step 2 in detail

The questions you will answer

The UK set follows the order of an HMRC compliance check letter: eligibility first, then costs, then forms and reconciliation. The questions are a simulation modelled on published HMRC guidance; they are not HMRC's questions.

Eligibility

  1. UK01Advance in science or technologyWhether the project sought an advance in the field, not only in the company's own knowledge or products.
  2. UK02Scientific or technological uncertaintyWhether the uncertainty is stated as something a competent professional could not readily resolve, and when it was resolved.
  3. UK03Competent professional identifiedWho judged the advance and the uncertainty, and what their qualifications and experience are.
  4. UK04Routine work excludedHow routine engineering, testing, commercial and administrative work was separated from the R&D activity.

Costs

  1. UK05Staff costs and time apportionmentHow staff costs were calculated and how the proportion of time on R&D was determined and recorded.
  2. UK06Externally provided workersWhether EPW payments meet the staff provider conditions, whether the provider is connected, and whether the 65 per cent restriction was applied.
  3. UK07Contracted-out R&DFor subcontracted work, whether the company is the party entitled to claim under the contracted-out rules, and what the contracts show.
  4. UK08Overseas expenditureWhether payments for EPWs or subcontractors outside the UK are excluded, or whether a stated exception applies.

Records

  1. UK11Grants, subsidies and the ERIS conditionsHow grant income is treated, and for ERIS whether the loss-making and intensity conditions are evidenced.
  2. UK12Reconciliation and approval of figuresWhether the claim reconciles to the accounts and the tax computation, and who approved the final figures.

Approval and filing

  1. UK09Claim notificationWhether a claim notification was required and, if so, submitted within six months of the end of the accounting period.
  2. UK10Additional Information FormWhether the AIF was submitted before the CT600, is complete and is consistent with the claim and the narrative.

Step 3 in detail

How answers are rated

For UK claims the evidence that moves a rating most is dated technical records, subcontractor agreements and time records, because those are what HMRC asks for in a check.

The evidence readiness score runs from 0 to 100. A higher score means more of your answers are backed by the documents you uploaded; a lower score means more answers are unsupported or contradicted. It describes the state of your evidence today, not the likelihood of an audit or the outcome of one.

What moves a rating in United Kingdom

  • Dated records outrank narrative written at claim time
  • Agreements outrank invoices
  • Time records outrank year-end estimates

Local examples

  • A Bristol software company claiming under the merged scheme for work to reduce latency in a real-time video pipeline, where the uncertainty was whether the target could be met on commodity hardware.
  • A Manchester engineering SME using ERIS because it made a loss and its R&D spend was more than 30 per cent of total expenditure.
  • A claim that included payments to a Polish subcontractor, where the company needed to show why the overseas restriction did not apply.

Rehearse the HMRC review before it happens.